Contipure AseptBloc DN – mechanical basics

No d'article: POT6

Partie contractante: KRONES AG - Academy

Non disponible 🛈


Description de produit

Necessary prior knowledge:

Contipure AseptBloc DN – basics of operation

Modules & Topics:

Get together, safety instructions, controlled clamps

  • Safety instructions
  • Safeties/interlocks/media
  • Parts of the controlled clamps and special tools

Controlled clamps Centering of the stretch rod

  • Adjusting the gap of the controlled clamps
  • Adjusting the height of the controlled clamps
  • Centering the stretch rod

Height of the blowing nozzle and pneumatic leakage check

  • Adjusting the height of the blowing nozzle
  • Correct disassembling of the blowing nozzle
  • Blowing station diagnostics
  • Cleaning of the pistons

Timing and synchronizing the transfer

  • How to check the timing
  • How to optimize the timing
  • Mechanical and electrical tools


Livraison 24h

En cas de livraison 24 h, nous vous envoyons les produits disponibles en un jour. Il vous suffit pour cela de sélectionner les produits avec le symbole 24h.
Veuillez noter que des frais supplémentaires peuvent être facturés à cet effet.

Partial delivery

En cas de livraison partielle, nous vous enverrons les produits disponibles d'ici quelques jours. Il vous suffit de sélectionner les produits que vous souhaitez obtenir immédiatement.Veuillez noter que des frais de port supplémentaires vous seront facturés.

Autres services

Pack de gestion des stocks

Pack de gestion des stocks

Minimiser les temps d'arrêt grâce à un package de stockage sur mesure

Découvrir maintenant

Mises à niveau

Mises à niveau

Maintenir ou optimiser durablement la productivité de vos installations existantes

Découvrir maintenant

Liste de substitution

Liste de substitution

Obtenir gratuitement un aperçu de tous les matériaux remplacés qui sont installés chez vous

Découvrir maintenant

Chatbot
close close close close