Contipure AseptBloc DN – mechanical basics

品番 POT6

パートナー: KRONES AG - Academy

オーダー可能 🛈

価格はお問い合わせください

pieces


Product description

Necessary prior knowledge:

Contipure AseptBloc DN – basics of operation

Modules & Topics:

Get together, safety instructions, controlled clamps

  • Safety instructions
  • Safeties/interlocks/media
  • Parts of the controlled clamps and special tools

Controlled clamps Centering of the stretch rod

  • Adjusting the gap of the controlled clamps
  • Adjusting the height of the controlled clamps
  • Centering the stretch rod

Height of the blowing nozzle and pneumatic leakage check

  • Adjusting the height of the blowing nozzle
  • Correct disassembling of the blowing nozzle
  • Blowing station diagnostics
  • Cleaning of the pistons

Timing and synchronizing the transfer

  • How to check the timing
  • How to optimize the timing
  • Mechanical and electrical tools


24時間納品

24時間納品で、在庫有りの製品を1日以内にお届けします。24 h のアイコンで製品を選択して下さい。
このオプションに関しては、追加料金がかかります。

一部納品

一部納品により、在庫ありの製品から数日以内にお届けします。ご希望の製品をすぐに選択してください。
このオプションの場合、追加の送料が発生いたします。

その他のサポート

在庫維持パッケージ

在庫維持パッケージ

オーダーメイドのストックキーピングパッケージ(予備品リスト)でダウンタイムを最小化

今すぐ始めましょう

アップグレード

アップグレード

既存システムの生産性を長期的に維持・最適化

今すぐ始めましょう

置換リスト

置換リスト

お客様のシステムに設置されているすべての置換え済み代替品の概要を無料で入手できます

今すぐ始めましょう

チュートリアルとウェビナー

チュートリアルとウェビナー

Krones.shopの機能については、チュートリアルまたはKronesのエキスパートへお問い合わせください

今すぐ始めましょう

Chatbot